MEDICAL, WELFARE & HEALTHCARE FACILITIES

Prefixes are omitted from names.

The “Sato no Kaze”: A Day-Care and Vocational Training
Center for Persons with Physical/Intellectual handicapped.

【Awarded】
● 2006 Japan Institute of Healthcare Architecture
● Sustainable Building Award Commemorating SB05 TOKYO
● 25th Osaka Streetscape Award
● 12th Osaka Urban Development Award

The site is a gentle slope of the mountain and is adjacent to the elementary school.

There were 108 steel pillars, shape was deformed, the external cornering etc was very difficult to form.

Wood-Material is frequently used according to the request of the owner, using various kinds of materials (brick, iron, architectural concrete, ALC, wood, stone), it is a diversified building with it's shape.

Moreover, it rocks naturally with rooftop greenery, the murmur of a brook, biotope, solar system. The construction period is short with high construction difficulty. A Night-View with lights is also a wonderful landscape.

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Mizukoshi, Yao City, Osaka

993.75㎡

● Steel Construction
● 2 Floors above ground

March, 2004

Seiji Nii architect & associates

Social Welfare Services Corporation - Maizuru Futaba Dormitory

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Maizuru City, Kyoto

2536.55㎡

● Steel Construction
● 4 Floors above ground

March, 2020

Ecofactory Corp. 1st Class Architect Office

Pay Nursing Home - AL GRAND HIRANO

Location:


Total Floor Space:

Structure:


Completion Date:

Designed By:
Kitsurenishi, Hirano-ku,
Osaka-shi

3,100.68㎡

● Steel Construction
● 6 Floors above ground

April 25, 2019

HOWA Development Co., Ltd.

Higashi-Yamamoto Wakaba Preschool

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Yao City, Osaka

3,077.04㎡

● Steel Construction
● 3 Floors above ground

January 15, 2019

Yao City Architecture Department

Chiyozaki Poplar Preschool - Tsumugi Fukushikai

Location:


Total Floor Space:

Structure:


Completion Date:

Designed By:
Chiyozaki, Osaka Nishi-ku,
Osaka

740.01㎡

● Steel Construction
● 5 Floors above ground

July 13, 2018

HOWA Development Co., Ltd.

Pay Nursing Home - Abeno Mariavilla

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Abeno Ward, Osaka City

1,119.74㎡

● Steel Construction
● 7 Floors above ground

October, 2018

Tsutsumu Katachi 1st-Class Architect Office

Group Home Slow-Life Yao Minami

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Yao City, Osaka

1,523.95㎡

●Steel Construction
●4 Floors above ground

February, 2018

Kawamata Architect Office

Special Elderly Nursing Home - Kawachinosato Nagase

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Higashi Osaka City, Osaka

3308.11㎡

●Steel Construction
●4 Floors above ground

September, 2018

TAPROOT

Special Elderly Nursing Home

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Higashi Osaka City, Osaka

2,239.00㎡

● Steel Construction
● 2 Floors above ground

August, 2018

Syoin Design Office

Special Elderly Nursing Home - Ranman Tsurumi

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Tsurumi-Ku, Osaka

2,295.13㎡

● Wooden Architecture 2 x 4
● 2 Floors above ground

February, 2017

FUJITA ARCHITECTS AND ENGINEERING OFFICE

Pay Nursing Home - Kishiwada Haruki Mariavilla

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Kishiwada City, Osaka

3,234.84㎡

● Steel Construction
● 3 Floors above ground

October, 2016

NEO ASSOCIATED ARCHITECTS

Yamaguchi Obstetrics and Gynecology Hospital: New Construction

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Yao City, Osaka

1147.20㎡

Steel Construction:
Four Floors above ground

February, 2016

Naito Architects. Co., Ltd.

Yao Municipal Hospital: Function Expansion Construction

1) Expansion
2) Renovation (1453㎡of the extent)

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Yao City, Osaka

1,355㎡

Steel Construction:
Five Floors above ground

May 26th, 2015

Hoseikai Ohmichi Clinic: New Construction

Dialysis Hospital

Location:

Total Floor Space:

Structure:



Completion Date:

Designed By:
Yao City, Osaka



Steel Construction:
One Floor underground
and Four Floors above ground

September 30th, 2014

YU Construction Design Office

Ishinkai Group Total Clinics

It is a big hospital specializing in outpatient, and located outskirts of Yao city, Osaka.

A spacious curved staircase has installed at the entrance hall, and the Space: that incorporates external light from the second floor will ease the tension of visitors.

Location:

Total Floor Space:

Structure:



Completion Date:

Designed By:
Ota, Yao City, Osaka

4937.78㎡

Reinforced Concrete
Construction:
Four Floors above ground

October, 2004

MIDO Co., Ltd.

Kusune Clinic, Medical Co-operative Union Kawachino

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Higashi Osaka City, Osaka

1,669㎡

Steel Construction:
Five Floors above ground

January 31st, 2009

Chuo Sekkei

Slow-Life Senri: Intensive-Care Home for the elderly

Location:

Total Floor Space:

Structure:



Completion Date:

Designed By:
Suita City, Osaka

3443.69㎡

Steel Construction:
Five Floors above
ground-Fireproof Building

September 30, 2008

Kawamata Architect Office

Group Home Sakuragaoka

The appearance, exterior, all rooms, common area also from the waist wall to the upper part is all concrete substrate finishing.

Besides, the wood-material is used for the floor and waist-part, therefore, the warmth of wood and the material of concrete are keeping a pleasing harmony.

Location:


Total Floor Space:

Structure:



Completion Date:

Designed By:
Sakuragaoka, Yao City,
Osaka

677.49㎡

Reinforced Concrete
Construction: Two Floors
above ground

February, 2005

Kensetsu COOP Osaka

Nursing Service Kosei-En: Incorporated Medical Institution

It is the facility aimed at nursing for the elderly, Day Service on the first floor, and the Group-Home is available on the second, third floor.

A large Space: is secured in the bathroom on the first floor, and the machinery bath is also enriched so that all service-users take a bath in spacious.

On the front exterior, the first floor is covered with a wooden louver which gives warmth, the curtain wall is used on the 2nd and 3rd Floors for taking natural light in. Also, it is a beautiful building where the accent stands out by attaching irregularities to the exterior wall.

Location:

Total Floor Space:

Structure:


Completion Date:

Designed By:
Yao City, Osaka

982.72㎡

Rebar ALC: three
Floors above ground

September, 2004

SHOWA SEKKEI, Inc.

Maria Nursery School

It is a building that changed the appearance by setting back the south side of the building facing the road in a staircase pattern.

Cherry Trees are planted around the gardens, and at the entrance ceremony, the pink outer wall and the cherry blossoms bring out harmony and glamor.

Regarding the interior design, we emphasized the safety of nursery schoolchildren, we devised the R-shaped-wood on the external corners of walls, etc. to ease the impact at the time of a collision.

Location:


Total Floor Space:

Structure:



Completion Date:

Designed By:
Wakabayashi Cho,
Osaka City, Osaka

1102.68㎡

Reinforced Concrete
Construction: Two Floors
above ground

February, 2004

Fujita Architects and Engineering Office

YU Clinic: TOKUSHUKAI GENERAL HOSPITAL

Because of the hospital dedicated to dialysis, we made careful attention for the installation of medical facilities and vibration countermeasures.

Due to the underground obstacles, our application performance was being put to the test.

Particular attention was paid to the Location: pattern in front of the station, carrying in and out of the piling machine, steel work, material-loading.

Location:


Total Floor Space:

Structure:



Completion Date:

Designed By:
Yamamoto Cho,
Yao City, Osaka

1318.88㎡

Steel Construction:
One Floor underground and
Five Floors above ground

August, 2003

Shoei Design Office

Takayasu-No-Sato: Intensive-Care Home for the elderly

The rooms-allocation is set up that residents can see the complete view of Yao City from each room. In the center of the building there is a colonnade and you can see the green from the middle corridor. For the elderly, it is a building where peace of mind can be preserved.

Location:


Total Floor Space:

Structure:



Completion Date:

Designed By:
Hattorigawa,
Yao City, Osaka

3032.03㎡

Reinforced Concrete
Construction: Five Floors
above ground

August, 2003

Kurokawa Construction Design

SUPPORT YAO: Yao-Municipal Intensive-Care Facility for the elderly

A curtain wall incorporating a lot of lighting. We installed floor heating in the place of gatherings.

On the first floor there is a large bath-house and a nursing care bath. The garden on the rooftop is a place for residents to relax.

Location:


Total Floor Space:

Structure:




Completion Date:

Designed By:
Aoyama Cho,
Yao City, Osaka

5455.77㎡

Reinforced Concrete
Construction
(Partially Steel Construction):
Three Floors above ground

October, 1998

Yao Municipal Office Construction Department and Ishimoto Architectural & Engineering Firm, Inc.