PUBLIC WORKS

Prefixes are omitted from names.

Yao Municipal Higashiyamamoto Wakaba Kindergarten: New Construction

Location:

Total Floor Space:

Structure:


The Completion Date:

Designed by:
Yao City, Osaka

3,077.04㎡

● Steel Construction
● 3 Floors above ground

January 15, 2019

Yao City,
Public Architecture Department

Nipponbashi Unified Elementary Through Junior High School

Location:

Total Floor Space:

Structure:



The Completion Date:

Designed by:
Osaka

6,160㎡

● Reinforced Concrete
   – Partially Steel Construction
● 6 Floors above ground

February 28, 2018

Tokyu Architects & Engineers INC.

Toneri Park Area-C Convenience-Accommodation: New Construction

Location:

Total Floor Space:



Structure:




The Completion Date:

Designed by:
Adachi, Tokyo

● Stand-Booth and BQ-Building: 256.24㎡
● Machinery Warehouse: 144.12㎡
● Restroom Building: 48.54㎡

● Stand-Booth and BQ-Building:
   Steel Construction, Single-Storied
● Machinery Warehouse:
   Steel Construction, Single-Storied

August, 2017

MORI LANDSCAPE ARCHITECTS INC.

Takayasu Unified Elementary Through Junior High School

【Schoolhouse Renovation】





【Gymnasium Renovation】





【Swimming Pool Renovation】




【Kitchen Facility Dismantling】


【Landscaping】


【Extension Work】



Location:

Total Floor Space:

Structure:

The Completion Date:

Designed by:
●Waterproofing
●Exterior Wall
●Fittings
●Interior Renovation
●Seismic Reinforcing

●Waterproofing
●Exterior Wall
●Fittings
●Interior Renovation
●Seismic Reinforcing

●Waterproofing
●Exterior Wall
●Fittings
●Interior Renovation

●2-Storied Steel Construction,
●Total Floor Space: 1396.99 ㎡

Land Development, Pavement,
Drainage, Fences, Workpieces

●Connecting Corridor
●Lifting Device Building (1 Lift)
●2-Storied Steel Construction,
●Total Floor Space: 35.74 ㎡
Yao City, Osaka

3,626.93㎡

2-Storied Steel Construction

March, 2016

Ogasahara Sekkei

Yao Municipal Library

Composite Facility with central library function, learning room, regional information provision, local information provision, youth center
Location:

Total Floor Space:

Structure:





The Completion Date:

Designed by:
Honmachi, Yao City, Osaka

4,100㎡

● Reinforced Concrete    Construction
●1 Floor under ground,
   4 Floors above ground
   and Single-Storied Penthouse

March, 2014

Yasui Architects & Engineers, Inc.

Nishi-Yamamoto Primary School: Seismic Reinforcing (Phase#1)

Location:
Total Floor Space:
Structure:
The Completion Date:
Designed by:
Yao City, Osaka


January 31, 2014
NAKAGAWA PLANNING & CONSTRUCTION CO., LTD.

Yokohama University of Pharmacy Memorial Hall

The maximum capacity of the accommodation: about 590 people, the design that made 100% green without cutting the traditional trees in the premises, the whole glass-enclosed Space: gives a sense of unity with nature.
Used as a place for various events inside and outside the campus, such as regular lectures, presentations and research societies.
Location:


Total Floor Space:

Structure:


The Completion Date:

Designed by:
Totsuka-Ku, Yokohama City,
Kanagawa

543㎡

● Steel Construction
● Single-Storied

February 28, 2013

NAKAGAWA PLANNING
& CONSTRUCTION CO., LTD.

Renovation for Tsunohazu Apartment (26) of Tokyo Metropolitan Disaster Management Staff

Location:
Total Floor Space:
Structure:



The Completion Date:

Designed by:
Shinjuku-Ku, Tokyo

●Reinforced Concrete    Construction
●4 Floors above ground

February, 2016

MODULE Consultants

Rehabilitation Center for the Physically and Mentally Handicapped

All necessary facilities such as Bathroom, Gymnasium, Pottery room, Kitchen are equipped for the Handicapped.
Location:


Total Floor Space:

Structure:




The Completion Date:

Designed by:
Minamihonmachi,
Yao City, Osaka

4,320.72㎡

● Reinforced Concrete
   Construction
● 1 Floor underground and
    5 Floors above ground.

2002

Yao City Construction Department

Prefectural Yao High School

This building is an unprecedented high-grade tiled building all over the prefecture high school. The Curves of Structure: at various places in a radial building arrangement centered on the Iconic Kitsuneyama of Yao High School. Although the Great Hanshin-Awaji Earthquake of 1995 hit an immediate after completion, the building did not peel off one tile of the outer wall.
Location:

Total Floor Space:

Structure:



The Completion Date:

Designed by:
Takamachi, Yao City, Osaka

5241.67㎡

●Reinforced Concrete
   Construction
●5 Floors above ground

January, 1995

Ogasahara Sekkei

Yao Lifelong Learning Center "Kagayaki"

It is a complex that encompasses a learning center and health center for Yao city citizens. The center passage passes through the 4th floor, and the oval large conference room on the 4th floor is arranged in the air, and the learning building and the health center building are connected. I feel the real pleasure of the Space: inside the building.
Location:

Total Floor Space:

Structure:




The Completion Date:

Designed by:
Yao City, Osaka

15,000㎡

● Reinforced Concrete
   Construction
● 1 Floor underground and
   4 Floors above ground.

April, 1994

RESEARCH INSTITUTE
OF ARCHITECTURE