TRADITIONAL JAPANESE ARCHITECTURE

Prefixes are omitted from names.

Yonanji Temple Main Hall - Renovation

Location:

Total Floor Space:

Structure:

The Completion Date:

Designed by:
Hirano-Ku, Osaka City, Osaka



● Wooden Architecture

August, 2008

Shunkichi Tanaka First-class Architect Office

Shibukawa Shrine Assembling Hall - New Construction

Location:

Total Floor Space:

Structure:


The Completion Date:

Designed by:
Yao City, Osaka

222㎡

● Wooden Architecture
● Single-Storied

November 1, 2014

NAKAGAWA PLANNING & CONSTRUCTION CO., LTD.

SeikoJi Temple

For it's concrete-built construction, we made strenuous efforts to provide the expressions of gable and eaves camber in drawings.

In addition, although the FRP material, such as Square Framing (Masugumi), Architrave (Kibana), Flat and Pike Timbers (Hirakouryo), etc., the tree expression can be kept forever, the inner and outer temple which also gives wooden-built feel.

Location:

Total Floor Space:

Structure:


The Completion Date:

Designed by:
Oihara, Yao City, Osaka

210.98㎡

● Reinforced Concrete
    Construction

September, 1997

Shoei Design Office

Shounenji Temple

Although it is a steel-frame ALC Structure, it's finishing looks like a pure wooden built. The Works of Conventional Carpenter Specializing in Temple (nails are not used) and latest facilities are integrated.

The TV cameras were installed for Buddhist-Parishioners and children who can not fit into the outer channel, to monitor the admission, in a separate room with the floor heating inside Temple. The lighting-up was also devised for night scenery.

Location:

Total Floor Space:

Structure:


The Completion Date:

Designed by:
Uematsucho, Yao City, Osaka

328㎡

● Steel Construction
● ALC Exterior Wall

March, 2007

Shoei Design Office

Tenrikyo Namikazu Branch Temple

It is a building as a Branch-Temple of Tenrikyo, a facility combined with a residence. The building has a hall inside, and the Space: for people to gather and chat.

Location:

Total Floor Space:

Structure:


The Completion Date:

Designed by:
Minamikawachi Gun, Osaka

456.29㎡

● Steel Construction
● 2 Floors above ground.

November, 2001

Souken Architect Office

Gokurakuji Temple

It is the building that the Temple is set up on the ground floor, and occasionally 2nd floor serves for the meeting-place. Ground Floor and 2nd have the residence-portion and line of flow, it is convenient to use, and the know-how of the temple construction is spaciously devised.

Location:


Total Floor Space:

Structure:


The Completion Date:

Designed by:
Kitakinomoto, Yao City,
Osaka

159.13㎡

● Steel Construction
● ALC Exterior Wall

August, 1999

Shoei Design Office

Saikouji Temple

In order to reflect the hearts of the believers, the outside mountain gate used wood specially ordered and paid close attention to curing so as not to be affected by changes in humidity during construction.

Location:

Total Floor Space:

Structure:


The Completion Date:

Designed by:
Yao City, Osaka

113.04㎡

● Reinforced Concrete
   Construction

1994

Gorin Sekkei